Call us at: 416-782-7227

  • Home
  • About
  • Services
    • Our Services
    • Environmental Assessments
    • Geotechnical Services
    • Movement Measurement
  • Pricing
  • Contact Us
  • More
    • Home
    • About
    • Services
      • Our Services
      • Environmental Assessments
      • Geotechnical Services
      • Movement Measurement
    • Pricing
    • Contact Us
  • Home
  • About
  • Services
    • Our Services
    • Environmental Assessments
    • Geotechnical Services
    • Movement Measurement
  • Pricing
  • Contact Us
416-782-7227

EAL Typical Pricing

Prices listed are based on a typical range. Actual price varies by site, site conditions, client requirements. Pricing in Canadian dollars, taxes extra. All work assumes unfettered site access. Pricing estimates represent total cost of EAL and supplier cost combined. Suppliers and EAL to be paid 50% in advance and 25% on day of field work, 25% prior to report delivery. Project estimates are developed according to project scope and variables. Call for a custom quote tailored to your situation.


Alternative Energy

Geothermal - Vertical Wells

$2,100

Desktop study

Geo-Electrical - Vertical Wells

$27,000

Desktop study

Geothermal Report - FTC

$2,500

Using client-provided data


Civil Engineering

Site Visit - Greater Toronto Area and London, ON

$1,000

4 hours, includes travel within GTA or London, ON

First meeting to review plans and issues on site including Geotechnical, Environmental Assessments, Civil Engineering, Utilities Review, Environmental Compliance, Storm and Ground Water Options, Alternative Energy, Seismic Site Class Evaluation 

Site Visit - Elsewhere in Canada

Request a Quote

Outside of the GTA, including remote locations.

Contact us for a quotation.

Daily Email Report

$800

 1 remote reading monitor review 


Environmental Assessments

Prices starting at:

Phase I Assessments

$3,000 to 15,000

(personal use to record of site condition use)

Phase II Environmental Assessments

$5,000 to $100,000

(personal use limited testing to record of site condition use)


Clients pay all subcontractors (drillers, labs, title searches, government search fees etc.)

Other Assessments Available

Request a Quote

  • Phase Three Environmental Site Assessment
  • Record of Site Condition
  • Risk Assessment
  • Contaminated land assessments
  • Contaminated water assessments
  • Underground fuel tank investigation
  • Degreaser delineation
  • Soil sampling

 

More Details on EAL Environmental Assessments


Environmental Compliance

Forms for Canadian Banks and Government

$2,000

Planning, Purchase, Mortgage Application  etc.


Geotechnical Reviews & Reports

Report on Bearing Capacity - 1 Test Hole

$5,750

 Drilling of 1 test hole, lab work and report 

Report on Bearing Capacity - 3 Test Holes

$10,000

Drilling of 3 test holes, lab work and report

Report on Bearing Capacity - 10 Test Holes

$21,500

 Drilling of 10 test holes, lab work and report 

Footing Review

$1,000

Assess the strength and nature of soil at building department request

Slope Stability Report

$4,600

Desktop review and letter 

Wenner Array Test (2 lines)

$2,000

For Towers, Pipes and Soil Conductivity


More Details on EAL Geotechnical Services


Movement Measurement

Small Movement Monitoring (1 Unit, Non-Electric)

$2,875

1 install, 1 de-install, 1 month in place, letter report 

Vibration Movement of Moving platform, x,y,z

$5,500

1 day, using existing equipment 

Construction Related Movement Measurement

$1,800

 Field day and daily letter report

 

More Details on EAL Movement Measurement


Seismic Site Class Evaluation

Seismic Site Class - REMI

$2,500

2 line, 30m seismic


Storm and Groundwater Options

Storm Water Analysis, Aquifer Recharge, Flow Reduction, Pollution Reduction

$3,000

Desktop study re: SAGES (TM) or other


Utilities Review

Function Services Report

$2,750

Desktop study to review utilities (water, storm, gas, sewer, power) to assist in project pre-planning

Prices listed are based on a typical range. Actual price varies by site, site conditions, client requirements. Pricing in Canadian dollars, taxes extra. All work assumes unfettered site access. Pricing estimates represent total cost of EAL and supplier cost combined. Suppliers and EAL to be paid 50% in advance and 25% on day of field work, 25% prior to report delivery. Project estimates are developed according to project scope and variables. Call for a custom quote tailored to your situation.



Copyright © 2020 Egmond Associates Ltd - All Rights Reserved.

  • Home
  • About
  • Our Services
  • Environmental Assessments
  • Geotechnical Services
  • Movement Measurement
  • Pricing
  • Contact Us
  • Privacy Policy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept